Entre Terras e Maresvideo

I WAS DEFEATED BY AN ANACONDA T1.ep155

23 de febrero de 2025 · 32 min · 506 vistas

¿Qué cubre este video?

Edgar and Sâmia work to install the engine exhaust hose and electrical conduits inside their boat.Watch The primary challenge involves routing a large-diameter exhaust hose from the engine through a locker to the stern, requiring a precise "gooseneck" (pescoço de ganso) configuration to prevent water backflow.3:16 The crew struggles to maneuver the stiff hose through tight, confined spaces within the cabinetry, eventually determining that the hose's existing memory prevents it from making the necessary 90-degree turn without kinking.9:15 Edgar decides to abandon the hose installation temporarily and plans to fabricate a stainless steel elbow fitting to achieve the required bend while maintaining the system's watertight integrity.10:28 The crew shifts focus to routing electrical conduits through the interior, including lines for 12-volt power and lighting, which they secure behind existing woodwork to keep the cabin clear.10:59 They use a hole saw to create passages for the conduits, navigating limited space and poor lighting to ensure the wiring reaches the navigation station and intended outlet locations.18:55

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema