Entre Terras e Maresvideo

I WAS DEFEATED BY AN ANACONDA T1.ep155

23 February 2025 · 32 min · 506 views

What this video covers

Edgar and Sâmia work to install the engine exhaust hose and electrical conduits inside their boat.Watch The primary challenge involves routing a large-diameter exhaust hose from the engine through a locker to the stern, requiring a precise "gooseneck" (pescoço de ganso) configuration to prevent water backflow.3:16 The crew struggles to maneuver the stiff hose through tight, confined spaces within the cabinetry, eventually determining that the hose's existing memory prevents it from making the necessary 90-degree turn without kinking.9:15 Edgar decides to abandon the hose installation temporarily and plans to fabricate a stainless steel elbow fitting to achieve the required bend while maintaining the system's watertight integrity.10:28 The crew shifts focus to routing electrical conduits through the interior, including lines for 12-volt power and lighting, which they secure behind existing woodwork to keep the cabin clear.10:59 They use a hole saw to create passages for the conduits, navigating limited space and poor lighting to ensure the wiring reaches the navigation station and intended outlet locations.18:55

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue