Sailing Jibseavideo

REFIT COMPLETE! - Ep 130

17 de marzo de 2023 · 12 min · 21K vistas

¿Qué cubre este video?

The owners of the sailboat Jibsea completed a five-week refit of the forward cabin, converting the space into a multi-purpose berth and storage area.11:07 The project involved constructing a new mattress, vinyl-wrapping EVA foam wall panels with contact adhesive, and installing a custom door latch system.0:55 To improve ventilation and comfort, the crew relocated the bed aft and centered it, which also allows for the installation of a lee cloth for use while underway.3:52 The reconfiguration created a dedicated storage compartment, dubbed "the shed," and improved cabin acoustics by zoning the speakers.7:26 The crew opted against using foam-backed vinyl for the wall panels to prevent moisture retention and material degradation in tropical climates.5:18 By moving the bed and organizing the storage, the crew cleared the cockpit of gear, restoring it for daily use.10:33 The project required approximately two and a half weeks of active labor, excluding time spent waiting for materials.11:25

Ver en YouTube

Más de Sailing Jibsea

Our First Time Sailing Norway’s Famous Fjords - Ep 283ago 2026When 2 Grown Kids Sail into Ålesund for the First Time - Ep 282ago 2026Rounding Norway's Most FEARED Headland Wasn't What We Expected - Ep 281jul 2026The Days That Keep Boat Life Going - Ep 280jul 2026

De Sailing Jibsea — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema