Sailing Jibseavídeo
REFIT COMPLETE! - Ep 130
17 de março de 2023 · 12 min · 21K visualizações
O que este vídeo aborda
The owners of the sailboat Jibsea completed a five-week refit of the forward cabin, converting the space into a multi-purpose berth and storage area.11:07 The project involved constructing a new mattress, vinyl-wrapping EVA foam wall panels with contact adhesive, and installing a custom door latch system.0:55 To improve ventilation and comfort, the crew relocated the bed aft and centered it, which also allows for the installation of a lee cloth for use while underway.3:52 The reconfiguration created a dedicated storage compartment, dubbed "the shed," and improved cabin acoustics by zoning the speakers.7:26 The crew opted against using foam-backed vinyl for the wall panels to prevent moisture retention and material degradation in tropical climates.5:18 By moving the bed and organizing the storage, the crew cleared the cockpit of gear, restoring it for daily use.10:33 The project required approximately two and a half weeks of active labor, excluding time spent waiting for materials.11:25
Mais de Sailing Jibsea
De Sailing Jibsea — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



