Sailing Jibseavídeo

REFIT COMPLETE! - Ep 130

17 de marzo de 2023 · 12 min · 21K visitas

Qué cubre este vídeo

The owners of the sailboat Jibsea completed a five-week refit of the forward cabin, converting the space into a multi-purpose berth and storage area.11:07 The project involved constructing a new mattress, vinyl-wrapping EVA foam wall panels with contact adhesive, and installing a custom door latch system.0:55 To improve ventilation and comfort, the crew relocated the bed aft and centered it, which also allows for the installation of a lee cloth for use while underway.3:52 The reconfiguration created a dedicated storage compartment, dubbed "the shed," and improved cabin acoustics by zoning the speakers.7:26 The crew opted against using foam-backed vinyl for the wall panels to prevent moisture retention and material degradation in tropical climates.5:18 By moving the bed and organizing the storage, the crew cleared the cockpit of gear, restoring it for daily use.10:33 The project required approximately two and a half weeks of active labor, excluding time spent waiting for materials.11:25

Ver en YouTube

Más de Sailing Jibsea

Reality of YouTubing + Sailing + Adventuring | Behind the Scenes - Ep 287sept 2026Our Backyard Is Norway’s Most Iconic Fjord - Ep 286sept 2026The Unpredictable Dangers of Sailing Norway's Fjords - Ep 285sept 2026HOVERAir X1 PROMAX: 3 Month Honest Drone Reviewago 2026

De Sailing Jibsea — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema