Sailing SV Delosvideo
1 Year Down – The Truth About This Dream (Aluminum Catamaran Build Pt. 37)
23 de mayo de 2025 · 24 min · 314K vistas
¿Qué cubre este video?
After 12 months of construction on a custom aluminum catamaran, the crew of SV Delos has transitioned from heavy metal fabrication to interior fit-out and systems installation.9:51 The build features 6mm hull plating at the waterline for increased structural integrity and a skeg-protected propulsion system and rudder to allow for beaching.15:14 To prioritize sailing performance and keep weight out of the ends, the design utilizes minikeels instead of daggerboards and a shorter bridge deck to maximize the trampoline area.15:57 The bow includes a sealed, reinforced crash compartment.17:13 Interior planning involves mapping the salon sofa and cabinetry using 3D modeling software, while electrical work includes routing DC and AC conduits to the battery and inverter compartment.6:05 The crew faces a May deadline to move the vessel out of French Polynesia to avoid import taxes, with a planned launch date between late 2025 and August 2026.20:49 Balancing the physical demands of the project requires managing stress and maintaining a consistent, incremental workflow.3:32
Más de Sailing SV Delos
De Sailing SV Delos — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



