Sailing SV Delosvideo

1 Year Down – The Truth About This Dream (Aluminum Catamaran Build Pt. 37)

May 23, 2025 · 24 min · 314K views

What this video covers

After 12 months of construction on a custom aluminum catamaran, the crew of SV Delos has transitioned from heavy metal fabrication to interior fit-out and systems installation.9:51 The build features 6mm hull plating at the waterline for increased structural integrity and a skeg-protected propulsion system and rudder to allow for beaching.15:14 To prioritize sailing performance and keep weight out of the ends, the design utilizes minikeels instead of daggerboards and a shorter bridge deck to maximize the trampoline area.15:57 The bow includes a sealed, reinforced crash compartment.17:13 Interior planning involves mapping the salon sofa and cabinetry using 3D modeling software, while electrical work includes routing DC and AC conduits to the battery and inverter compartment.6:05 The crew faces a May deadline to move the vessel out of French Polynesia to avoid import taxes, with a planned launch date between late 2025 and August 2026.20:49 Balancing the physical demands of the project requires managing stress and maintaining a consistent, incremental workflow.3:32

Watch on YouTube

More from Sailing SV Delos

This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Aug 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Aug 2026Years of Work...One Flip of a Switch 🤯 Aluminum Catamaran Build Pt. 81Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue