Sailing SV Delosvideo

1 Year Down – The Truth About This Dream (Aluminum Catamaran Build Pt. 37)

23 maggio 2025 · 24 min · 314K visualizzazioni

Cosa tratta questo video

After 12 months of construction on a custom aluminum catamaran, the crew of SV Delos has transitioned from heavy metal fabrication to interior fit-out and systems installation.9:51 The build features 6mm hull plating at the waterline for increased structural integrity and a skeg-protected propulsion system and rudder to allow for beaching.15:14 To prioritize sailing performance and keep weight out of the ends, the design utilizes minikeels instead of daggerboards and a shorter bridge deck to maximize the trampoline area.15:57 The bow includes a sealed, reinforced crash compartment.17:13 Interior planning involves mapping the salon sofa and cabinetry using 3D modeling software, while electrical work includes routing DC and AC conduits to the battery and inverter compartment.6:05 The crew faces a May deadline to move the vessel out of French Polynesia to avoid import taxes, with a planned launch date between late 2025 and August 2026.20:49 Balancing the physical demands of the project requires managing stress and maintaining a consistent, incremental workflow.3:32

Guarda su YouTube

Altro da Sailing SV Delos

This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84ago 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83ago 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82ago 2026Years of Work...One Flip of a Switch 🤯 Aluminum Catamaran Build Pt. 81ago 2026

Da Sailing SV Delos — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema