Project Brupegvideo

THE GEARBOX DOESN'T FIT!!! - Project Brupeg Ep.312

9 de julio de 2023 · 27 min · 37K vistas

¿Qué cubre este video?

Damien and the crew of the Brupeg, a converted fishing trawler, face a clearance conflict while installing a new, oversized gearbox into the engine room.5:01 The gearbox sump drain plug currently rests against the steel floor of the bilge, preventing the unit from seating properly.8:20 To gain the necessary 20mm of clearance, the team evaluates several structural modifications, including grinding down a protruding bulkhead, notching the bilge ribs, or cutting out and flattening the V-shaped section of the bilge floor.11:54 Before performing any hot work, the crew must drain a large, oil-filled ballast tank located directly beneath the bilge.13:59 They successfully remove a seized bronze bung using a hammer and socket, then rig a pneumatic system to pressurize the tank to 15 psi, forcing the thick, viscous oil into external IBC containers via a gravity-assist hose.17:20 The team continues to weigh the structural implications of modifying the hull versus the gearbox sump.

Ver en YouTube

Más de Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456ago 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455ago 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453jul 2026

De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema