Project Brupegvideo

THE GEARBOX DOESN'T FIT!!! - Project Brupeg Ep.312

9 July 2023 · 27 min · 37K views

What this video covers

Damien and the crew of the Brupeg, a converted fishing trawler, face a clearance conflict while installing a new, oversized gearbox into the engine room.5:01 The gearbox sump drain plug currently rests against the steel floor of the bilge, preventing the unit from seating properly.8:20 To gain the necessary 20mm of clearance, the team evaluates several structural modifications, including grinding down a protruding bulkhead, notching the bilge ribs, or cutting out and flattening the V-shaped section of the bilge floor.11:54 Before performing any hot work, the crew must drain a large, oil-filled ballast tank located directly beneath the bilge.13:59 They successfully remove a seized bronze bung using a hammer and socket, then rig a pneumatic system to pressurize the tank to 15 psi, forcing the thick, viscous oil into external IBC containers via a gravity-assist hose.17:20 The team continues to weigh the structural implications of modifying the hull versus the gearbox sump.

Watch on YouTube

More from Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456Aug 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455Aug 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454Jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453Jul 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue