Project Brupegvideo

THE GEARBOX DOESN'T FIT!!! - Project Brupeg Ep.312

9 luglio 2023 · 27 min · 37K visualizzazioni

Cosa tratta questo video

Damien and the crew of the Brupeg, a converted fishing trawler, face a clearance conflict while installing a new, oversized gearbox into the engine room.5:01 The gearbox sump drain plug currently rests against the steel floor of the bilge, preventing the unit from seating properly.8:20 To gain the necessary 20mm of clearance, the team evaluates several structural modifications, including grinding down a protruding bulkhead, notching the bilge ribs, or cutting out and flattening the V-shaped section of the bilge floor.11:54 Before performing any hot work, the crew must drain a large, oil-filled ballast tank located directly beneath the bilge.13:59 They successfully remove a seized bronze bung using a hammer and socket, then rig a pneumatic system to pressurize the tank to 15 psi, forcing the thick, viscous oil into external IBC containers via a gravity-assist hose.17:20 The team continues to weigh the structural implications of modifying the hull versus the gearbox sump.

Guarda su YouTube

Altro da Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456ago 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455ago 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454lug 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453lug 2026

Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema