sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión
sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026

InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión

Classic Yacht TV · video

EP07 Building the schooner Malabar IV | Summer recap #1

25 de noviembre de 2025 · 16 min · 8K vistas

Ver en YouTube

¿Qué cubre este video?

Emily Harris continues the restoration of the schooner Malabar IV, focusing on the installation of the final three frames.▶ 8:00 The team uses a laser level and string lines to ensure the frames remain parallel and centered.▶ 8:21 Because the propeller shaft prevents the use of through-bolts in this section of the hull, the crew secures the frames to the horn timber using half-inch bronze drifts.▶ 9:00 The project has progressed through the installation of sawn, laminated, and steamed frames, with approximately one-third of the planking complete.▶ 9:46 Harris manages the build alongside volunteer assistants, including Sam, who joined for two months to learn traditional boatbuilding techniques.▶ 10:59 Despite a temporary work stoppage during the summer due to family obligations, the project maintains momentum.▶ 5:00 Harris seeks a buyer to commission the vessel and provide the funding necessary to accelerate construction, with the goal of completing the hull in time to race in the Fastnet.▶ 16:01

Más de Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVmay 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVene 2026EP09 Positioning laminated floors and frames, summer recap #3: Building the schooner Malabar IVdic 2025EP08 Making laminated frames, last timber floor, summer recap #2: Building the schooner Malabar IVdic 2025

De Classic Yacht TV — ve el barco, la tripulación y cada video analizado del canal.

Reportar un problema
InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026