Classic Yacht TVvidéo

EP07 Building the schooner Malabar IV | Summer recap #1

25 novembre 2025 · 16 min · 8K vues

Ce que couvre cette vidéo

Emily Harris continues the restoration of the schooner Malabar IV, focusing on the installation of the final three frames.8:00 The team uses a laser level and string lines to ensure the frames remain parallel and centered.8:21 Because the propeller shaft prevents the use of through-bolts in this section of the hull, the crew secures the frames to the horn timber using half-inch bronze drifts.9:00 The project has progressed through the installation of sawn, laminated, and steamed frames, with approximately one-third of the planking complete.9:46 Harris manages the build alongside volunteer assistants, including Sam, who joined for two months to learn traditional boatbuilding techniques.10:59 Despite a temporary work stoppage during the summer due to family obligations, the project maintains momentum.5:00 Harris seeks a buyer to commission the vessel and provide the funding necessary to accelerate construction, with the goal of completing the hull in time to race in the Fastnet.16:01

Regarder sur YouTube

Plus de vidéos de Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVmai 2026EP12 fitting planks: Building the schooner Malabar IVfévr. 2026EP11 shaping planks: : Building the schooner Malabar IVjanv. 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVjanv. 2026

De Classic Yacht TV — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème