Flight Level Zerovideo
Our New Chapter Starts Now
24 de octubre de 2025 · 13 min · 1K vistas · Ensenada
Sailboat lowered into marina water by crane lift
¿Qué cubre este video?
Chris and Karmen prepare their Beneteau 57, named Vanishing Point, for departure from Baja Naval in Mexico. The crew inspects the hull, noting the condition of the zincs and confirming a monthly maintenance plan with a diver.1:32 The cockpit features four electric winches and custom padding.1:47 Before launching, the crew cleans the Isinglass and fills the water tanks.8:14 After completing customs clearance, the boat is lifted and launched from the yard.2:55 The crew plans a route that includes a potential stop at Catalina before continuing the passage home.9:46 During the initial departure from the harbor, the AIS triggers an alarm, which the crew identifies as a routine harbor-clearing notification.12:02 The vessel clears the harbor and begins the transit.11:48
Barcos en este video
Más de Flight Level Zero
De Flight Level Zero — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



