Mais
Idioma
Modo de exibição
Flight Level Zerovídeo
24 de outubro de 2025 · 13 min · 1K visualizações · Ensenada
Sailboat lowered into marina water by crane lift
O que este vídeo aborda
Chris and Karmen prepare their Beneteau 57, named Vanishing Point, for departure from Baja Naval in Mexico. The crew inspects the hull, noting the condition of the zincs and confirming a monthly maintenance plan with a diver.▶ 1:33 The cockpit features four electric winches and custom padding.▶ 1:47 Before launching, the crew cleans the Isinglass and fills the water tanks.▶ 8:13 After completing customs clearance, the boat is lifted and launched from the yard.▶ 2:32 The crew plans a route that includes a potential stop at Catalina before continuing the passage home.▶ 9:47 During the initial departure from the harbor, the AIS triggers an alarm, which the crew identifies as a routine harbor-clearing notification.▶ 11:59 The vessel clears the harbor and begins the transit.▶ 11:50
Barcos neste vídeo
Mais de Flight Level Zero
De Flight Level Zero — veja o barco, a tripulação e cada vídeo analisado do canal.