Sailing Yabávideo

25 Days of Christmas: Fixing the Mast — Sailing Yabá 232

1 de diciembre de 2024 · 28 min · 62K vistas

¿Qué cubre este video?

Ben and MP perform maintenance on the mast of their boat, Yabá, while hauled out on a beach. The primary project involves installing a custom-fabricated stainless steel mast cap to resolve structural stress caused by the backstay and middle stay being mounted at different heights. The new cap consolidates the attachment points for both stays. Ben uses a grinder to fit the cap, seals it with Sikaflex polyurethane, and secures it without drilling new holes. To facilitate the installation, the crew uses temporary lines attached to the cat head to pull the mast forward, allowing the middle stay to be connected. After securing the mast cap and stays, Ben finds the backstay tensioner remains too loose, indicating that the stay requires shortening to achieve proper tension. The crew also demonstrates an improvised method for filling water tanks by running a hose through a cabin window and manually accessing the tanks under the floorboards.

Ver en YouTube

Más de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema