Sailing Yabávidéo

25 Days of Christmas: Fixing the Mast — Sailing Yabá 232

1 décembre 2024 · 28 min · 62K vues

Ce que couvre cette vidéo

Ben and MP perform maintenance on the mast of their boat, Yabá, while hauled out on a beach. The primary project involves installing a custom-fabricated stainless steel mast cap to resolve structural stress caused by the backstay and middle stay being mounted at different heights. The new cap consolidates the attachment points for both stays. Ben uses a grinder to fit the cap, seals it with Sikaflex polyurethane, and secures it without drilling new holes. To facilitate the installation, the crew uses temporary lines attached to the cat head to pull the mast forward, allowing the middle stay to be connected. After securing the mast cap and stays, Ben finds the backstay tensioner remains too loose, indicating that the stay requires shortening to achieve proper tension. The crew also demonstrates an improvised method for filling water tanks by running a hose through a cabin window and manually accessing the tanks under the floorboards.

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásept. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaoût 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème