Project Brupegvideo

How we launched without an engine - Project Brupeg Ep.326

22 de octubre de 2023 · 54 min · 91K vistas

¿Qué cubre este video?

The 10-year rebuild of the fishing trawler Brupeg culminates in a two-stage launch process necessitated by the vessel's 2.2-meter draft and the marina's shallow 1-meter depth at low tide.8:02 Because the main engine remains non-functional during the initial launch to allow for in-water alignment, the crew coordinates a tow using a small tugboat and a secondary dinghy to maneuver the vessel into its berth.9:05 Preparations for the launch include welding 20 sacrificial anodes to the hull at 1.5-meter intervals, applying antifouling paint to the keel cooling system, and re-tapping seawater inlet bolts to metric sizes.0:56 The crew also stows heavy equipment, including outboards and metalworking tools, and cleans the fuel tanks by flushing them with diesel to prepare for a new hydraulic oil system.13:09 The vessel enters the water without a functioning engine or hot water system, as the project remains an active work boat build.11:08 Launching a deep-draft vessel in a shallow marina requires precise tidal planning and auxiliary towing support when the main propulsion system is offline.

Ver en YouTube

Más de Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456ago 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455ago 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453jul 2026

De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema