Project Brupegvídeo

How we launched without an engine - Project Brupeg Ep.326

22 de outubro de 2023 · 54 min · 91K visualizações

O que este vídeo aborda

The 10-year rebuild of the fishing trawler Brupeg culminates in a two-stage launch process necessitated by the vessel's 2.2-meter draft and the marina's shallow 1-meter depth at low tide.8:02 Because the main engine remains non-functional during the initial launch to allow for in-water alignment, the crew coordinates a tow using a small tugboat and a secondary dinghy to maneuver the vessel into its berth.9:05 Preparations for the launch include welding 20 sacrificial anodes to the hull at 1.5-meter intervals, applying antifouling paint to the keel cooling system, and re-tapping seawater inlet bolts to metric sizes.0:56 The crew also stows heavy equipment, including outboards and metalworking tools, and cleans the fuel tanks by flushing them with diesel to prepare for a new hydraulic oil system.13:09 The vessel enters the water without a functioning engine or hot water system, as the project remains an active work boat build.11:08 Launching a deep-draft vessel in a shallow marina requires precise tidal planning and auxiliary towing support when the main propulsion system is offline.

Ver no YouTube

Mais de Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.45608/2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.45508/2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.45407/2026Good Mates & Boat Maintenance - Project Brupeg Ep.45307/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema