Project Brupegvideo

How we launched without an engine - Project Brupeg Ep.326

October 22, 2023 · 54 min · 91K views

What this video covers

The 10-year rebuild of the fishing trawler Brupeg culminates in a two-stage launch process necessitated by the vessel's 2.2-meter draft and the marina's shallow 1-meter depth at low tide.8:02 Because the main engine remains non-functional during the initial launch to allow for in-water alignment, the crew coordinates a tow using a small tugboat and a secondary dinghy to maneuver the vessel into its berth.9:05 Preparations for the launch include welding 20 sacrificial anodes to the hull at 1.5-meter intervals, applying antifouling paint to the keel cooling system, and re-tapping seawater inlet bolts to metric sizes.0:56 The crew also stows heavy equipment, including outboards and metalworking tools, and cleans the fuel tanks by flushing them with diesel to prepare for a new hydraulic oil system.13:09 The vessel enters the water without a functioning engine or hot water system, as the project remains an active work boat build.11:08 Launching a deep-draft vessel in a shallow marina requires precise tidal planning and auxiliary towing support when the main propulsion system is offline.

Watch on YouTube

More from Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456Aug 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455Aug 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454Jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453Jul 2026

From Project Brupeg — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue