RAN Sailingvideo
Closing the Cockpit On Our 52 ft Sailboat: Getting the Sole In Place - Ep. 460 RAN Sailing
10 de octubre de 2025 · 22 min · 111K vistas · Skåne
¿Qué cubre este video?
Johan and Malin construct the cockpit sole and a large integrated hatch for their 52-foot sailboat using PET foam core sandwich panels.0:16 The process involves cutting the foam to size with a handheld CNC router, beveling edges at 45 degrees, and laminating the panels using a vacuum bagging technique.1:01 Johan details the function of each layer in the vacuum bag: the vacuum bag itself for atmospheric pressure, breeder mesh for uniform pressure and excess resin absorption, perforated release film to prevent resin starvation, and peel ply to create a ready-to-bond surface without amine blush.4:23 The sole is installed with a 1% slope toward the drains to ensure water runoff.14:59 The hatch design incorporates double seals and increased foam thickness to provide the rigidity required to support a cockpit table base.15:45 The project concludes with the installation of the sole, while the crew monitors storm Amy, which brings wind gusts of 34 knots and leaks into their workshop.20:43
Más de RAN Sailing
De RAN Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



