RAN Sailingvídeo

Closing the Cockpit On Our 52 ft Sailboat: Getting the Sole In Place - Ep. 460 RAN Sailing

10 de outubro de 2025 · 22 min · 111K visualizações · Skåne

O que este vídeo aborda

Johan and Malin construct the cockpit sole and a large integrated hatch for their 52-foot sailboat using PET foam core sandwich panels.0:16 The process involves cutting the foam to size with a handheld CNC router, beveling edges at 45 degrees, and laminating the panels using a vacuum bagging technique.1:01 Johan details the function of each layer in the vacuum bag: the vacuum bag itself for atmospheric pressure, breeder mesh for uniform pressure and excess resin absorption, perforated release film to prevent resin starvation, and peel ply to create a ready-to-bond surface without amine blush.4:23 The sole is installed with a 1% slope toward the drains to ensure water runoff.14:59 The hatch design incorporates double seals and increased foam thickness to provide the rigidity required to support a cockpit table base.15:45 The project concludes with the installation of the sole, while the crew monitors storm Amy, which brings wind gusts of 34 knots and leaks into their workshop.20:43

Ver no YouTube

Mais de RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran Sailing08/2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailing08/2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailing08/2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailing08/2026

De RAN Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema