Sailing Yabávideo

Our Boat Hauls Out in 1 Day & This Woodwork HAS to be finished — Sailing Yabá

8 de marzo de 2026 · 34 min · 58K vistas · shipyard in Paraty, Brazil

Craftsman fits carved gaff jaw onto spar under shelter

¿Qué cubre este video?

The crew of the boat Yaba prepares for a haul-out at a shipyard by fabricating new gaff-rig components, specifically the boom, gaffs, and mast jaws.0:18 To ensure the jaws remain horizontal when the gaff is raised to a 45-degree angle, the owner extends the jaw horns upward using a custom joint.4:10 This joint features a mortise-and-tenon design secured with epoxy and a wooden tree nail, or peg, which is driven through an offset hole to pull the joint tight.10:05 The team uses scrap ash and ipir wood sourced from the shipyard to construct these parts.8:17 To protect the raw wood from moisture and warping, they apply varnish immediately after sanding.23:57 The project is completed under a strict deadline as the boat awaits its turn in the shipyard’s launch crib.14:09 The crew also applies animal fat to the shipyard’s wooden slipway planks to reduce friction during the boat’s transition into the water.22:56

Ver en YouTube

Más de Sailing Yabá

This Anchorage Was Worth Every Miserable Mile — Sailing Yabáago 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáago 2026Sailing Through the World's Largest Atlantic Rainforest! — Sailing Yabájul 2026Sailing to Brazil's Most Dangerous Sandbanks — Sailing Yabájul 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema