Sailing Yabávideo
Our Boat Hauls Out in 1 Day & This Woodwork HAS to be finished — Sailing Yabá
8 de marzo de 2026 · 34 min · 58K vistas · shipyard in Paraty, Brazil
Craftsman fits carved gaff jaw onto spar under shelter
¿Qué cubre este video?
The crew of the boat Yaba prepares for a haul-out at a shipyard by fabricating new gaff-rig components, specifically the boom, gaffs, and mast jaws.0:18 To ensure the jaws remain horizontal when the gaff is raised to a 45-degree angle, the owner extends the jaw horns upward using a custom joint.4:10 This joint features a mortise-and-tenon design secured with epoxy and a wooden tree nail, or peg, which is driven through an offset hole to pull the joint tight.10:05 The team uses scrap ash and ipir wood sourced from the shipyard to construct these parts.8:17 To protect the raw wood from moisture and warping, they apply varnish immediately after sanding.23:57 The project is completed under a strict deadline as the boat awaits its turn in the shipyard’s launch crib.14:09 The crew also applies animal fat to the shipyard’s wooden slipway planks to reduce friction during the boat’s transition into the water.22:56
Más de Sailing Yabá
De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



