Sailing Yabávidéo

Our Boat Hauls Out in 1 Day & This Woodwork HAS to be finished — Sailing Yabá

8 mars 2026 · 34 min · 58K vues · shipyard in Paraty, Brazil

Craftsman fits carved gaff jaw onto spar under shelter

Ce que couvre cette vidéo

The crew of the boat Yaba prepares for a haul-out at a shipyard by fabricating new gaff-rig components, specifically the boom, gaffs, and mast jaws.0:18 To ensure the jaws remain horizontal when the gaff is raised to a 45-degree angle, the owner extends the jaw horns upward using a custom joint.4:10 This joint features a mortise-and-tenon design secured with epoxy and a wooden tree nail, or peg, which is driven through an offset hole to pull the joint tight.10:05 The team uses scrap ash and ipir wood sourced from the shipyard to construct these parts.8:17 To protect the raw wood from moisture and warping, they apply varnish immediately after sanding.23:57 The project is completed under a strict deadline as the boat awaits its turn in the shipyard’s launch crib.14:09 The crew also applies animal fat to the shipyard’s wooden slipway planks to reduce friction during the boat’s transition into the water.22:56

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

This Anchorage Was Worth Every Miserable Mile — Sailing Yabáaoût 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáaoût 2026Sailing Through the World's Largest Atlantic Rainforest! — Sailing Yabájuil. 2026Sailing to Brazil's Most Dangerous Sandbanks — Sailing Yabájuil. 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème