Sailing Squibvidéo

Squib Refit - Rub rail removal - Installation of sail tracks - Battery base installation /63

18 avril 2024 · 16 min · 1K vues

Ce que couvre cette vidéo

Peter performs a series of structural and electrical refit tasks on his pocket catamaran, Squib, to address chronic water ingress at the hull-to-deck joint.0:13 He removes the original rub rails, grinds the underlying fiberglass, and prepares the area for sealing.6:15 To improve exterior utility, he installs new keder rails along the roofline, drilling mounting holes every 20 centimeters.6:59 He fills these holes with thickened epoxy to ensure secure screw retention in the thinner fiberglass laminate.8:12

Beyond hull repairs, he removes a diesel heater that provided cabin warmth during the winter, noting its reliable performance.11:12 He constructs a new battery base and custom-fits wooden support battens near the engine compartment.11:39 During this process, he measures the engine to ensure clearance for the new battery housing and prepares to document the engine specifications for an updated vessel registration certificate.14:41 He uses a space heater to manage solar power output while working in 15-degree Celsius temperatures.11:27

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème