Sailing Squibvidéo

Sailing Squib - May 2026/3

3 septembre 2026 · 23 min · 116 vues

Ce que couvre cette vidéo

Refitting the interior of the 30-ft sailboat Squib involves replacing degraded plexiglass portlights and installing a commercial 12-volt water heater. To replace the four portlights, the owner removes the old plastic panes, scrapes away the original sealant using a utility knife and a Dremel wire brush, and cleans the aluminum frames with acetone.12:01 New custom-cut glass panes are bonded into the frames using Sikaflex, with the owner noting that applying the sealant to the trim strip before pressing it onto the glass simplifies the process.14:49 Rusted screws are replaced with stainless steel hardware.15:37

The owner also removes a failed, DIY 12-volt water heater constructed from a repurposed pipe.15:57 This process requires dismantling the bathroom vanity and removing surrounding wood paneling.19:32 After accidentally flooding the cabin by failing to deactivate the water pump, the owner installs a new 7-liter 12-volt water heater.20:03 Additional interior work includes fabricating and installing 3mm plywood panels to conceal wiring and create storage shelves in the head.3:51 Proper surface preparation and sealant application are essential for watertight portlight seals.

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33juin 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème