Piratas Aderivavidéo
Jour 33 : Pourquoi PERSONNE ne parle de ça quand on restaure un voilier ?
2 juillet 2025 · 8 min · 525 vues
Ce que couvre cette vidéo
Jorman installs new windows on his sailboat, a two-person task requiring an assistant to hold the frames from the exterior while he secures them from the inside. He notes that the second window installation shows significant improvement in fit and centering compared to the first, thanks to increased practice. With the lower side windows now complete, he plans to begin designing and replacing the upper windows next. The project remains a labor-intensive process that requires consistent effort to reach completion. In response to a viewer question regarding boat purchases, Jorman advises that any buyer must haul a vessel out of the water to inspect the hull, keel, propeller, rudder, and antifouling condition. He suggests negotiating a cost-sharing agreement with the seller for the haul-out fee, which can be deducted from the final purchase price if the sale proceeds.
Plus de vidéos de Piratas Aderiva
De Piratas Aderiva — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



