Sven Yrvindvidéo
21 Sep 2025 The second mastholder
20 septembre 2025 · 5 min · 3K vues
Ce que couvre cette vidéo
Sven Yrvind installs the second mast holder for his side-by-side mast configuration.▶ 3:47 The masts lean outward to prevent the yards from touching, while the sides remain parallel to the horizon.▶ 0:09 The construction process involves securing the holders with thickened epoxy, followed by an exterior reinforcement of glass fiber.▶ 0:40 Yrvind plans to turn the boat on its side to apply additional glass fiber reinforcement to the interior of the mast holders.▶ 4:35 He notes that the peel ply releases more easily with each successive installation as he refines his technique.▶ 1:53 The mast holders are designed to be low-profile, occupying three square meters of space.▶ 4:47 Yrvind also demonstrates a specialized expanding rubber tool used for reaching into cramped pipes or deep cavities during the assembly process.▶ 2:49
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



