We've Been EVICTED 😰 Ready or Not - Hard Dodger Hardtop FINAL INSTALL (17)
4 mai 2025 · 21 min · 83K vues
Ce que couvre cette vidéo
Fabricating a custom hard dodger and hardtop for a sailboat involves a multi-stage process of carbon fiber layup, fairing, and high-build priming. The construction utilizes foam cores reinforced with wood blocks at mounting points to ensure structural integrity for screw attachments.6:19 To maintain a watertight seal, PVC conduits are integrated into the davit legs to separate dinghy lift lines from electrical wiring.5:50 The process requires repeated cycles of applying fairing filler, sanding, and coating with high-build primer to eliminate surface waviness and achieve a smooth finish.12:39 Residual wax from mold-making can cause adhesion failures in fairing compounds, necessitating thorough cleaning before further application.10:20 During the final installation phase, the team removes the existing canvas bimini and temporarily secures the mast with topping lifts and a spinnaker halyard to safely disconnect the backstay.18:23 The lightweight carbon fiber structure is then positioned and glassed into place.19:55 Consistent sanding and fairing are the primary requirements for achieving a professional finish on custom composite marine structures.20:47
Plus de vidéos de Expedition Engineering
De Expedition Engineering — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



