Sailing Yabávidéo

Launch countdown starts NOW! Building diesel tank mounts to test our engine — Sailing Yabá 168

14 janvier 2024 · 32 min · 86K vues

Ce que couvre cette vidéo

The crew of the vessel Yabá installs a diesel fuel system and tests it for leaks before the boat's upcoming launch. To support the fuel tanks, the crew constructs temporary wooden pillars and horizontal beams, securing them with through-bolts and custom-cut wooden fillers to ensure the tanks remain level and stable. They install a new fuel filter, replacing a faulty unit that lacked a safety float, and use temporary transparent hoses to visually monitor fuel flow and identify air bubbles in the lines.18:42 The system includes a manifold with individual valves for each tank, allowing the crew to isolate fuel sources and manage old or new diesel independently.17:05 A mechanical fuel level sensor is integrated into the tank and connected to a gauge to provide remote monitoring.20:25 After filling the system with approximately 35 liters of diesel, the crew successfully primes the lines and runs the engine, confirming the integrity of the connections and the functionality of the fuel delivery.28:42

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct. 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct. 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept. 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème