Sven Yrvindvidéo
Tensioning the oar rope.
15 mars 2026 · 2 min · 3K vues
Yellow boat’s oar rope tensioned by hand
Ce que couvre cette vidéo
Sven Yrvind modifies a custom cruiser by testing adhesive bonds on epoxy laminate surfaces.▶ 0:37 Initial tests show the glue adheres strongly enough to delaminate the fiberglass, prompting a surface preparation technique using oil-based treatments to improve bonding.▶ 0:23 The project also involves troubleshooting a battery bank where two units lack capacity, while a third remains functional and a fourth is expected to recover.▶ 0:54 To address structural concerns with a hanging wall design, Yrvind fabricates a custom tensioner mounted at a right angle to the roof.▶ 1:35 This mechanism aims to stabilize the wall, a departure from traditional mounting methods like rollers or ball joints.▶ 1:55 The ongoing construction emphasizes simplicity in design to increase overall pressure and structural integrity.
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



