Acorn To Arabellavidéo
Four Months Left, But Who's Counting? - Episode 254 - Acorn to Arabella: Journey of a Wooden Boat
24 février 2023 · 27 min · 105K vues · Harwinton, Connecticut
Ce que couvre cette vidéo
The wooden boat *Arabella* nears its four-month launch deadline with ongoing interior and deck outfitting.0:03 Crew members are installing port lights, which involves cutting circular openings in plywood, filling voids with epoxy, and sealing the frames with butyl tape.2:07 To improve cockpit utility, the team is constructing a custom navigation and storage console for the housetop.7:45 This unit integrates a Dorade box for cabin ventilation, designed with internal dams and scuppers to prevent water intrusion while maintaining airflow.19:09 The console features a removable front panel to protect flush-mounted electronics from UV damage and includes integrated cubbies for deck storage.21:17 The structure is assembled using box joints cut on a table saw, chosen for efficiency over traditional dovetails.22:23 The team also relocated the Nanni diesel engine controls and fuel filter readout to a separate panel at the aft end of the cockpit to streamline the main navigation console.11:22
Plus de vidéos de Acorn To Arabella
De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



