Acorn To Arabellavideo

Four Months Left, But Who's Counting? - Episode 254 - Acorn to Arabella: Journey of a Wooden Boat

24 February 2023 · 27 min · 105K views · Harwinton, Connecticut

What this video covers

The wooden boat Arabella nears its four-month launch deadline with ongoing interior and deck outfitting.0:03 Crew members are installing port lights, which involves cutting circular openings in plywood, filling voids with epoxy, and sealing the frames with butyl tape.2:07 To improve cockpit utility, the team is constructing a custom navigation and storage console for the housetop.7:45 This unit integrates a Dorade box for cabin ventilation, designed with internal dams and scuppers to prevent water intrusion while maintaining airflow.19:09 The console features a removable front panel to protect flush-mounted electronics from UV damage and includes integrated cubbies for deck storage.21:17 The structure is assembled using box joints cut on a table saw, chosen for efficiency over traditional dovetails.22:23 The team also relocated the Nanni diesel engine controls and fuel filter readout to a separate panel at the aft end of the cockpit to streamline the main navigation console.11:22

Watch on YouTube

More from Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... AgainOct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSept 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue