Acorn To Arabellavideo

Four Months Left, But Who's Counting? - Episode 254 - Acorn to Arabella: Journey of a Wooden Boat

24 February 2023 · 27 min · 105K views · Harwinton, Connecticut

What this video covers

The wooden boat *Arabella* nears its four-month launch deadline with ongoing interior and deck outfitting.0:03 Crew members are installing port lights, which involves cutting circular openings in plywood, filling voids with epoxy, and sealing the frames with butyl tape.2:07 To improve cockpit utility, the team is constructing a custom navigation and storage console for the housetop.7:45 This unit integrates a Dorade box for cabin ventilation, designed with internal dams and scuppers to prevent water intrusion while maintaining airflow.19:09 The console features a removable front panel to protect flush-mounted electronics from UV damage and includes integrated cubbies for deck storage.21:17 The structure is assembled using box joints cut on a table saw, chosen for efficiency over traditional dovetails.22:23 The team also relocated the Nanni diesel engine controls and fuel filter readout to a separate panel at the aft end of the cockpit to streamline the main navigation console.11:22

Watch on YouTube

More from Acorn To Arabella

Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by SailboatJul 2026Fjord Hopping | Arabella Sails East Toward The NuddickJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue