Sven Yrvindvidéo
9 Sep 2025 Playing around with the latch extension
8 septembre 2025 · 8 min · 2K vues
Ce que couvre cette vidéo
Sven Yrvind modifies the hatch gaskets on his boat by drilling 8.5mm drainage holes at the top and bottom of the gasket seals to prevent water accumulation.▶ 1:08 He installs a rope handle on the interior of the hatch to allow for closing the hatch from a seated position inside the cabin.▶ 3:07 During the installation, he identifies a clearance issue where the latch pipe contacts the surrounding structure, requiring minor adjustments to the hardware fit.▶ 1:48 He reflects on the evolution of marine construction and navigation tools, comparing the introduction of epoxy in 1975 to historical shifts in technology like the transition from inkwells to ballpoint pens and the use of slide rules for calculations.▶ 4:41
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



