WEsailvidéo
Sailboat Projects: FINALLY the Help Warren Needed! | Episode 307
1 août 2025 · 32 min · 19K vues · New Zealand
Ce que couvre cette vidéo
With 10 days remaining before crew arrival and 13 days until launch, the host accelerates final boat projects in New Zealand.▶ 0:50 Key tasks include finishing a custom freezer tub, which required precise fiberglass work, rigid foam insulation, and internal bracing to prevent wall collapse during curing.▶ 4:36 The host also addresses water intrusion in the rudders by drilling relief holes to drain moisture, then sealing them with micro-balloon-thickened epoxy, fiberglass, and gel coat.▶ 16:41 Additional work involves installing new hardware for a dual-sail setup to allow simultaneous use of a Code Zero and spinnaker.▶ 23:27 To manage the workload, the host recruits local volunteers for labor-intensive tasks like sanding, polishing, and routing lines through tight cavities.▶ 9:32 The project list concludes with electrical system reinstallation and finalizing custom cabinetry, including slide-out drawers for galley electronics.▶ 26:23 Systematic project management and external assistance prove essential for meeting the tight pre-launch deadline.
Plus de vidéos de WEsail
De WEsail — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



