WEsailvideo

Sailboat Projects: FINALLY the help Warren needed! | Episode 307

1 August 2025 · 32 min · 19K views · New Zealand

What this video covers

With 10 days remaining before crew arrival and 13 days until launch, the host accelerates final boat projects in New Zealand.0:50 Key tasks include finishing a custom freezer tub, which required precise fibreglass work, rigid foam insulation, and internal bracing to prevent wall collapse during curing.4:36 The host also addresses water intrusion in the rudders by drilling relief holes to drain moisture, then sealing them with micro-balloon-thickened epoxy, fibreglass, and gel coat.16:41 Additional work involves installing new hardware for a dual-sail setup to allow simultaneous use of a Code Zero and spinnaker.23:27 To manage the workload, the host recruits local volunteers for labour-intensive tasks like sanding, polishing, and routing lines through tight cavities.9:32 The project list concludes with electrical system reinstallation and finalizing custom cabinetry, including slide-out drawers for galley electronics.26:23 Systematic project management and external assistance prove essential for meeting the tight pre-launch deadline.

Watch on YouTube

More from WEsail

We Had to Abort the Passage | Sailing Fiji's Reef-Strewn WatersSept 2026France to Fiji in 24 Hours | Back to Boat LifeAug 2026We Flew Halfway Around the World to Surprise My Family | Fiji to FranceAug 202613 Knots, Big Seas & Dolphins at Sunset | Sailing Back to Fiji's MainlandAug 2026

From WEsail — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue