Sven Yrvindvidéo

23 Oct Martin the welder & side bottoms

22 octobre 2024 · 6 min · 3K vues · Hycklinge

Ce que couvre cette vidéo

Sven Yrvind visits Martin Svets near Hycklinge to progress the construction of a cold-molded boat.Watch After completing the epoxy fillets in the hull corners, the focus shifts to fabricating the side bottoms.3:19 Yrvind uses a scribing tool to transfer the hull shape onto plywood panels, a technique he previously employed on three other cold-molded builds.4:23 Before installing the side panels, he applies epoxy to the undersides and paints the interior surfaces, noting that these areas will be inaccessible once the structure is permanently joined.4:42 The process involves an iterative approach where panels are measured, marked, and fitted to ensure accuracy before final bonding.3:56 The work continues with the preparation of the middle hull sections.6:23

Regarder sur YouTube

Plus de vidéos de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.oct. 2026Nervously Cutting the Divinycell Sheets.oct. 2026Trying to Get the Sheerline Right.oct. 2026More molds up.oct. 2026

De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème