Sailing Magic Carpetvidéo

Hooking Up A Brand New Engine!

4 octobre 2024 · 23 min · 77K vues

Ce que couvre cette vidéo

Refitting a Cape George Cutter 36 requires installing a new Beta Marine engine, including plumbing the raw water intake, fuel system, and exhaust. Because the engine sits below the waterline, the installation requires a siphon break vented to the bridge deck to prevent back-siphoning through the exhaust or a failed pump impeller.3:11 The crew fabricated a custom high-rise exhaust to gain 30 centimeters of vertical clearance, allowing for proper installation of a water-lift muffler while maintaining access to the shaft and dripless seal.13:00 Electrical work involves routing starter cables from the battery under the chart table, installing a battery switch, and connecting the engine’s 11-way wiring loom to the cockpit panel.5:15 The fuel system includes a dual-valve manifold setup to enable fuel polishing.16:46 Engine alignment with the CV shaft was verified using feeler gauges to ensure less than one degree of misalignment.12:25 A functioning engine is a mandatory prerequisite for the marine survey required to obtain hull insurance for the vessel.11:19 Careful planning of plumbing, electrical routing, and exhaust geometry ensures the engine is ready for its first start.

Regarder sur YouTube

Bateaux dans cette vidéo

Cape GEORGE 38Leur bateau

Plus de vidéos de Sailing Magic Carpet

Sailing Northern Canada | Alone on a Long Summers Daysept. 2026Sailing Northern Canada | Fishing, Beachcombing.août 2026Suddenly, The Boat Wasn't Where We Left It [Ep 3]août 2026An Island That Google Maps Can't See [Ep 2]août 2026

De Sailing Magic Carpet — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème