WE MIGHT WANT TO HIRE HELP FOR THIS…
9 mars 2025 · 28 min · 111K vues
Ce que couvre cette vidéo
Matt and his father construct a steel ground-mount solar array frame to withstand hurricane-force winds.0:37 They source 20-foot, 3/8-inch thick steel beams and fabricate the structure using a stick welder and a circular saw equipped with a metal-cutting blade.2:07 The project involves digging holes for corner posts, setting them in concrete, and drilling mounting holes into the steel using step-up bits and cutting oil.17:01 The team prioritizes flat-surface welding on the ground before lifting the assembled components into place to bolt them to the concrete slab.20:35 Despite initial challenges with weld quality and layout squareness, the frame supports the weight of the installers, confirming its structural integrity for the planned solar panel load.25:15 The crew opts for raw steel over galvanized material to save costs, planning to learn metal painting techniques to prevent corrosion.25:50 The project demonstrates that careful layout, slow drilling speeds to prevent bit tempering, and over-building with thick steel can compensate for amateur welding skills in off-grid infrastructure projects.18:40
Plus de vidéos de Sailing Good, Bad, and Ugly
De Sailing Good, Bad, and Ugly — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



