Project Brupegvidéo

Launch and a surprise - Can you believe this is Ep.400!

27 avril 2025 · 19 min · 34K vues

Ce que couvre cette vidéo

The 46-ton steel vessel Brewpeg undergoes a haul-out at Port City Fabrications for hull maintenance, including antifouling and plumbing modifications.Watch During the haul-out, the owner cleans the bilge of oily sludge and antifreeze, noting that the vessel’s air conditioning unit currently drains directly into the bilge.0:56 To improve future maintenance, the owner modifies a grey water outlet by installing a ball valve and a barrel union, allowing for easier removal of congealed fat and debris from the plumbing.9:21 The crew also inspects the internal water tanks, which feature clear inspection hatches, and plans future repairs to address minor rust and install new stainless steel pickups to increase usable water capacity from 4.7 to 5.3 tons.9:44 After confirming the prop shaft grease seal is intact, the vessel is relaunched.17:05 Port City Fabrications donates the labor costs for the haul-out, allowing the project to allocate more funds toward cadet training and permanent crew.18:27

Regarder sur YouTube

Plus de vidéos de Project Brupeg

Over Engineering a Simple Bracket - Project Brupeg Ep. 458août 2026How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.457août 2026Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456août 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455août 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème