Project Brupegvideo
Launch and a surprise - Can you believe this is Ep.400!
27 aprile 2025 · 19 min · 34K visualizzazioni
Cosa tratta questo video
The 46-ton steel vessel Brewpeg undergoes a haul-out at Port City Fabrications for hull maintenance, including antifouling and plumbing modifications.Watch During the haul-out, the owner cleans the bilge of oily sludge and antifreeze, noting that the vessel’s air conditioning unit currently drains directly into the bilge.0:56 To improve future maintenance, the owner modifies a grey water outlet by installing a ball valve and a barrel union, allowing for easier removal of congealed fat and debris from the plumbing.9:21 The crew also inspects the internal water tanks, which feature clear inspection hatches, and plans future repairs to address minor rust and install new stainless steel pickups to increase usable water capacity from 4.7 to 5.3 tons.9:44 After confirming the prop shaft grease seal is intact, the vessel is relaunched.17:05 Port City Fabrications donates the labor costs for the haul-out, allowing the project to allocate more funds toward cadet training and permanent crew.18:27
Altro da Project Brupeg
Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



