Sailing SV Delosvidéo
No Filter: A True Week of Building Our Own Catamaran (Part 25)
21 février 2025 · 31 min · 300K vues
Ce que couvre cette vidéo
Building an aluminum expeditionary catamaran requires extensive planning for plumbing and interior bulkhead construction. The crew installs various fittings for water and black water tanks, including fill lines, vents, and pump-out hoses.1:40 They encounter challenges with hose sizing, specifically finding that standard 38-millimeter fill hoses are oversized for typical marina infrastructure, leading them to adapt designs with smaller 19-millimeter fittings.2:14 To maintain watertight integrity, they weld mounting plates onto bulkheads for secure hose pass-throughs.4:28 For interior cabinetry, the team develops a method to create curved bulkheads by kerfing wood panels and filling the slots with structural epoxy.13:10 They construct a custom jig to hold these panels at a precise radius while the epoxy cures.15:14 This process replaces the need for multiple separate pieces, increasing structural strength and simplifying finishing work. The project involves constant iteration, including testing different epoxy types and adjusting bulkhead placement relative to the boat's centerline.22:07
Plus de vidéos de Sailing SV Delos
De Sailing SV Delos — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



