Sailing SV Delosvideo

No Filter: A True Week of Building Our Own Catamaran (Part 25)

21 February 2025 · 31 min · 300K views

What this video covers

Building an aluminum expeditionary catamaran requires extensive planning for plumbing and interior bulkhead construction. The crew installs various fittings for water and black water tanks, including fill lines, vents, and pump-out hoses.1:40 They encounter challenges with hose sizing, specifically finding that standard 38-millimeter fill hoses are oversized for typical marina infrastructure, leading them to adapt designs with smaller 19-millimeter fittings.2:14 To maintain watertight integrity, they weld mounting plates onto bulkheads for secure hose pass-throughs.4:28 For interior cabinetry, the team develops a method to create curved bulkheads by kerfing wood panels and filling the slots with structural epoxy.13:10 They construct a custom jig to hold these panels at a precise radius while the epoxy cures.15:14 This process replaces the need for multiple separate pieces, increasing structural strength and simplifying finishing work. The project involves constant iteration, including testing different epoxy types and adjusting bulkhead placement relative to the boat's centerline.22:07

Watch on YouTube

More from Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Sept 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Aug 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue