Wildling Sailingvidéo

Another Big Push Towards The Ocean!

18 avril 2025 · 28 min · 114K vues

Ce que couvre cette vidéo

Arthur prepares his double canoe for a planned June 1st departure by completing a series of refit tasks, including engine maintenance, interior organization, and rigging upgrades.0:55 He installs a new, sturdier inner forestay fitting higher on the mast, requiring a custom-length Dyneema stay that he stretches to ensure proper tension.10:20 To improve sail handling, he plans to add a lazy jack system and replaces lightweight cam cleats on the boom with up-rated versions for the main outhaul and reefing lines, following design advice from Hanneke.21:00 He also installs vented levers on the forward hatches to improve ventilation and reduce water ingress while underway.14:15 The aft compartment is cleared and painted to serve as a dedicated tool storage area, while the engine sleds are secured with new cleats and 6mm pre-stretched polyester line.18:00 Arthur continues to evaluate designs for a cockpit enclosure or doghouse, noting the low boom height as a primary constraint.25:50

Regarder sur YouTube

Plus de vidéos de Wildling Sailing

One Final Refit Before Crossing The Atlantic.août 20262 Days Alone at Sea On my Primitive Double-Canoe.août 2026A Night Passage Through Orca Territoryjuil. 2026Getting Very Comfortable Solo Sailing My Big Catamaranjuil. 2026

De Wildling Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème