Sailing Jibseavidéo
IMMEDIATE REPAIRS NEEDED DURING ATLANTIC CROSSING (Part 2) - Ep 170
4 février 2024 · 14 min · 19K vues · Atlantic Ocean
Ce que couvre cette vidéo
During an Atlantic crossing from the Canary Islands toward Cape Verde, the crew of Jibsea experiences a masthead shackle failure that forces a repair in 8-to-10-knot winds and 8-foot swells.0:20 The crew replaces the broken shackle and installs a larger block to maintain spinnaker use.0:33 Light winds and calm seas necessitate 12 hours of motoring to maintain progress, followed by a period of sailing with winds on the nose.4:03 The crew also discovers significant rips and gashes in the spinnaker near the head, which they temporarily patch with sail tape.8:13 While managing these repairs, the crew maintains the boat's electrical systems by running the generator to charge batteries and camera equipment.4:36 They supplement their passage diet by catching mahi-mahi and attempting to bake sourdough bread.10:10 The vessel maintains a slow pace, averaging between 3.7 and 5.3 knots, while the crew monitors the remaining distance to Cape Verde.3:48
Plus de vidéos de Sailing Jibsea
De Sailing Jibsea — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



