Sailing Jibseavídeo

IMMEDIATE REPAIRS NEEDED DURING ATLANTIC CROSSING (Part 2) - Ep 170

4 de fevereiro de 2024 · 14 min · 19K visualizações · Atlantic Ocean

O que este vídeo aborda

During an Atlantic crossing from the Canary Islands toward Cape Verde, the crew of Jibsea experiences a masthead shackle failure that forces a repair in 8-to-10-knot winds and 8-foot swells.0:20 The crew replaces the broken shackle and installs a larger block to maintain spinnaker use.0:33 Light winds and calm seas necessitate 12 hours of motoring to maintain progress, followed by a period of sailing with winds on the nose.4:03 The crew also discovers significant rips and gashes in the spinnaker near the head, which they temporarily patch with sail tape.8:13 While managing these repairs, the crew maintains the boat's electrical systems by running the generator to charge batteries and camera equipment.4:36 They supplement their passage diet by catching mahi-mahi and attempting to bake sourdough bread.10:10 The vessel maintains a slow pace, averaging between 3.7 and 5.3 knots, while the crew monitors the remaining distance to Cape Verde.3:48

Assistir no YouTube

Mais de Sailing Jibsea

Reality of YouTubing + Sailing + Adventuring | Behind the Scenes - Ep 287set. de 2026Our Backyard Is Norway’s Most Iconic Fjord - Ep 286set. de 2026The Unpredictable Dangers of Sailing Norway's Fjords - Ep 285set. de 2026HOVERAir X1 PROMAX: 3 Month Honest Drone Reviewago. de 2026

De Sailing Jibsea — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema