sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter
sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026

AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter

RAN Sailing · vidéo

3 Years of Building Our 52 ft Sailboat - Ep. 467 Ran Sailing

28 novembre 2025 · 25 min · 92K vues · Skåne

Regarder sur YouTube

Ce que couvre cette vidéo

Three years into the construction of a custom 52-foot sailboat, the project has transitioned from hull and structural work to interior and systems installation. The vessel features a sandwich hull with a cedar wood core and fiberglass-epoxy laminate, designed by Ulf Rageberg for offshore performance.▶ 1:10 Major milestones completed include flipping the hull, installing watertight bulkheads, and finishing the deck and cockpit.▶ 4:46 The builders report that vacuum bagging and repetitive lamination were the most mentally taxing phases, while the primary structural error involved a bulkhead that required removal to allow for proper shroud reinforcement tabbing.▶ 8:07 The project timeline has shifted from an initial five-year estimate to approximately six years, with a projected completion date in 2028 and a launch in 2029.▶ 16:40 Financial expenditures for materials have reached $70,000 to $80,000, with epoxy accounting for $20,000 of that total.▶ 19:28 Inflation has increased the estimated total project cost from $350,000 to as much as $450,000.▶ 21:24 Documenting the build for social media adds roughly 20% to the total labor time.▶ 11:11

Plus de vidéos de RAN Sailing

Port Side Toe Rail & Deckhouse Carbon Corners - Ep. 494 Ran Sailingjuil. 2026The Boat Gets Its Edge - Ep. 493 Ran Sailingjuin 2026Opening Up The Deckhouse: The Last Window Cutout - Ep. 492 Ran Sailingjuin 2026The Last Major Lamination on Our 52ft Sailboat! - Ep. 491 Ran Sailingjuin 2026

De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

Signaler un problème
AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026