Project Brupegvidéo

Arriving at Yeppoon and moving a 48 tonne trawler with ropes - Project Brupeg Ep.403

21 mai 2025 · 16 min · 27K vues · The Narrows, Queensland

Ce que couvre cette vidéo

The 48-tonne steel trawler Brupeg transits from the Narrows to Roslyn Bay, Yeppoon, while navigating a 1.5-meter ocean swell and a 0.5-meter wind chop.0:43 Because of damaged pins on the starboard stabilizer wing, the crew retracts both wings to maintain symmetry, resulting in an uncomfortable, lively motion during the passage.4:09 The vessel maintains 10.5 knots at 1300 RPM, aided by a favorable current, to reach the shallow Yeppoon basin entrance at high tide.7:25 Upon arrival, the crew maneuvers the 48-tonne vessel to a new wharf position using only manual rope tensioning from the bow and stern lines.11:51 The crew plans to repair the stabilizer pins at the current berth before heading north.14:59 The anchor winch currently operates slowly because it draws power from the steering pump on the Cummins engine, necessitating a future upgrade to a high-volume oil pump.2:36

Regarder sur YouTube

Plus de vidéos de Project Brupeg

How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.457août 2026Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456août 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455août 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454juil. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème