Project Brupegvídeo

Arriving at Yeppoon and moving a 48 tonne trawler with ropes - Project Brupeg Ep.403

21 de maio de 2025 · 16 min · 27K visualizações · The Narrows, Queensland

O que este vídeo aborda

The 48-tonne steel trawler Brupeg transits from the Narrows to Roslyn Bay, Yeppoon, while navigating a 1.5-meter ocean swell and a 0.5-meter wind chop.0:43 Because of damaged pins on the starboard stabilizer wing, the crew retracts both wings to maintain symmetry, resulting in an uncomfortable, lively motion during the passage.4:09 The vessel maintains 10.5 knots at 1300 RPM, aided by a favorable current, to reach the shallow Yeppoon basin entrance at high tide.7:25 Upon arrival, the crew maneuvers the 48-tonne vessel to a new wharf position using only manual rope tensioning from the bow and stern lines.11:51 The crew plans to repair the stabilizer pins at the current berth before heading north.14:59 The anchor winch currently operates slowly because it draws power from the steering pump on the Cummins engine, necessitating a future upgrade to a high-volume oil pump.2:36

Ver no YouTube

Mais de Project Brupeg

How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.45708/2026Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.45608/2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.45508/2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.45407/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema