Sailing Squibvidéo

Squib's Refit - Partition in the anchor locker - Remove anchor fitting - Sanding the hull /78

1 août 2024 · 22 min · 799 vues

Ce que couvre cette vidéo

Refitting the anchor locker and salon of the pocket catamaran Squib requires extensive structural modifications and surface preparation. To install a new partition in the anchor locker, the crew removes the external anchor fitting and the internal mast support, which necessitates unbolting the entire assembly to access the fasteners.2:12 After clearing the locker, the owner laminates the new bulkhead using fiberglass cloth and thickened epoxy.7:38 The crew also removes a redundant metal anchor ring, fills the resulting holes with epoxy, and sands the interior surfaces before applying paint.11:10

Simultaneously, the crew prepares the salon for painting by priming the interior and coating storage compartments with bilge paint.8:40 To modernize the electrical system, the owner installs 65-watt USB 3.0 charging ports into the deck salon seating, replacing older 12-volt outlets.15:41 The exterior hull undergoes sanding with 400-grit paper to prepare for a final paint job, a process that includes removing deck hardware and fittings.20:28 The project concludes with a second coat of primer applied to the salon interior.21:20

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème